Minor Repairs / Maintenance
For small fixes that don't need to be notified to a building control body: routine maintenance or like-for-like work, as listed in Schedule 4 of the Building Regulations. The record is kept in MODLE for the audit trail; no regulator is notified.
If the work affects the structure, fire safety or other regulated parts of the building, it isn't minor: choose another pathway.
Where it is available: on a work record created from the building, HRB or not.
The pathway has 6 steps after the opening steps. Nothing stops you from continuing; what is still missing is listed at Package Ready.
1. Type of work
Pick the Schedule 4 description that matches the works from a searchable list:
| Code | Work |
|---|---|
| S4 1(a) | Replacement of fixed electrical equipment (no new fixed cabling or consumer unit) |
| S4 1(b) | Replacement of damaged cable (single circuit only) |
| S4 1(c) | Re-fixing or replacing the enclosure of an existing electrical installation component |
| S4 1(d) | Mechanical protection to an existing fixed electrical installation |
| S4 1(e) | Installation or upgrade of main or supplementary equipotential bonding |
| S4 1(f) | Existing fixed building service: replacement of a part, or addition of an output or control device |
| S4 1(g) | Provision of a self-contained fixed building service |
| S4 1(h) | Replacement external door (door or frame not more than 50% glazed) |
| S4 1(i) | Fixed internal lighting to an existing non-dwelling (not more than 100 m²) |
| S4 1(j) | Replacement of a sanitary convenience, washbasin, sink, bidet, fixed bath, shower, rainwater gutter or downpipe |
| S4 1(k) | Existing cold-water supply: replacement of part, or addition of an output or control device |
| S4 1(l) | Hot-water storage system (vessel up to 15 litres) |
| S4 1(m) | Roof or loft-space thermal insulation |
| S4 2 | Addition of light fittings, switches, socket outlets or fused spurs to an existing circuit |
| S4 3 | Telephone, extra-low-voltage, IT, signalling or control wiring and equipment |
Some of these are subject to the conditions in Schedule 4, shown in the list. If none fits, or you are not sure, choose None of the above / Unsure, and consider whether the works are minor at all.
2. Asset Tag
What the works are about, where, and the evidence.
- Add asset tag: pick the tag from the building's asset register, or create one if the building has none. Switch between assets in the strip at the top.
- For each asset:
- the asset tag and the description of works (scope);
- the materials used: material, quantity and unit;
- photos in three stages, Before, During and After: drop photos, videos or voice notes onto a stage, or press +;
- a pin on the floor plan where the works are: choose the pin tool, click the plan and drag the pin to the exact spot. If the building has no plan yet, upload one (PDF, PNG or JPG).
New tags show on the building as provisional until the record reaches Package Ready.
For the package, the record needs at least one asset and photos of each stage.
3. Worker Details
Who did the works: name, employer and email, entered by hand, and their digital signature, drawn or uploaded as an image. A new signature replaces the old one, which stays in the record's history. All four are required for the package.
4. Communications
The record's conversation with the client, the contractor or the regulator. Attach files, mention people from the Project Directory with @, and assets with #.
5. Package Ready
Core lists what is still outstanding: the type of work, an asset, photos of each stage and the worker's details and signature. Click an item to open its step, or Ignore it. Download package is available once nothing is outstanding; Download anyway (N missing) downloads it as it is.
The package holds:
- the Minor Works Record: one MODLE PDF with the record and the building, the type of work, a page per asset with its details, materials and photos (each one links to its original), and the worker with their signature;
- the record's status report;
- the photos, filed by asset tag and stage.
See The package and the golden thread.
6. Golden thread
Everything the record holds and its append-only audit trail. Submit sends the record.