The Change Control Log

Planned works records keep a register of every change to the approved design or works. In a Planned Works (HRB) record the step is called Change Control Log; in a Planned Works (non-HRB) record it is Change request, a lighter form of the same register.

Add a change​

  1. Open the record and go to the Change Control Log step (or Change request for non-HRB).
  2. Press Add change (or Add change request). The change proforma opens.
  3. Fill it in and press Save change. The change appears in the register.

What the proforma asks for​

The change

FieldWhat to write
Project name, AddressThe project and the site address.
Change No. RefYour reference for the change, such as ERR-XXX-001.
Completed byWho is filling it in: PD, PC, DT or SC.
Originator of requestThe name and company that asked for the change.
Date of issue, Target dateWhen it was raised and when a response or approval is due.
Change detailsA short title. It is what the register shows.
Brief descriptionThe change itself.
Reason for / benefit of changeWhy it is needed.
Documents and plans affectedWhat has to be updated because of it.
Parties consultedThe consultants and dutyholders you consulted.
Evidence of advice givenAttach the correspondence from the parties consulted. Each file is kept as a document of the record, filed under the change's reference.
How the change complies with Building RegulationsYour explanation of how compliance is maintained.

HRB records only

FieldWhat to write
BSR Ref #The Building Safety Regulator's reference.
G1, G2, G3 approvalThe gateway approvals the change relates to.
Type of changeRecorded, Notifiable or Major. Notifiable and major changes must be issued to the Building Safety Regulator.

Signatures and status

  • The Principal Designer and the client each give their name and company and the date, and sign on screen.
  • Status of change: Pending, Approved or Rejected.

The register​

The register lists every change with its number, reference, project, details, date of issue, target date, type of change (HRB) and status.

  • Edit a change with the pencil, for example to record its approval.
  • Delete never removes a change. It stays in the register, struck through, marked Voided with who voided it and when, so the record keeps its full history. A voided change can't be edited or restored.

Where the changes go​

The record's status report, in its package, includes the change control log (or the change requests) with every change, voided ones included. The evidence you attached travels in the package with the record's documents.